Item Coversheet

City Council Meeting
7/12/2022
Agenda Item Transmittal

 Agenda Item: 8.

 Agenda Title: Discuss and consider action on Granting the PUA Temporary Construction and Permanent Easements for portions of the 1080 Water Line, which crosses the following City properties:

 Council Action:
 Discuss and Consider Action

 Department: Assistant City Manager

 Staff Contact: Lindsey Oskoui


1. INTRODUCTION/PURPOSE


Approval of temporary construction and permanent easements for the future West Travis County Public Utility Agency 1080 water line.

2. DESCRIPTION/JUSTIFICATION

a) Background


The 1080 Transmission Main is a proposed 24” water line extending just west of the NW intersection of FM2244 and Bee Cave Parkway to a point approximately 8,798 feet west. The line will parallel, then cross Bee Cave Parkway, generally within easements, for approximately 6,755 feet, then proceed west, crossing Ranch Road 620 and continuing west, generally
paralleling Bee Cave Parkway, within easements, terminating at a proposed 24” water line location to be constructed by others. The transmission main will be owned and operated by the West Travis County Public Utility Agency (WTCPUA).



b) Issues and Analysis

The PUA is seeking easements from the City, among other affected property owners, authorizing construction and  perpetual ownership of and access to the future water line.  It is planned to cross four city properties:

 

a) 12308 Galleria Parkway aka "the Staats property" (TCAD Parcel ID 740545,  PUA Project ID 3) 1.4139 acre permanent easement area

 

b) southeast corner of Bee Cave Parkway and RR 620 aka "the Crescent Tract" (TCAD Parcel ID 740568  PUA Project ID 11) .5520 acre permanent easement area

 

c) 3726 RR 620 aka "the Mollison Tract" (TCAD Parcel ID 541352,  PUA Project ID 14) .0625 acre permanent easement area

 

d) west of and adjacent to 3726 RR 620 Bee Cave Parkway aka "Bee Cave Central Park" (TCAD Parcel ID 721564, PUA Project ID 16) .3882 acre permanent easement area

 

 

The alignments have been designed to generally avoid existing manmade features and substantial trees, but in the event there is a conflict, the PUA will be solely responsible for replacement and re-constitution, including, but not limited to replacement of paths (existing and future) and drainage infrastructure.

 



3. FINANCIAL/BUDGET

Amount Requested Fund/Account No. 
Cert. Obligation GO Funds
Other source Grant title
Addtl tracking info 

4. TIMELINE CONSIDERATIONS

The PUA is ready to begin construction. The construction permit is approved. All other easements have been obtained. They are concerned delay in construction could cause additional increases in construction costs.

5. RECOMMENDATION

Approval and authorization of mayor to execute the easements.
ATTACHMENTS:
DescriptionType
Site Plan Project DescriptionBackup Material
Draft Permanent Easement Text Area 3 - Staats Tract Backup Material
Draft Temporary Construction Easement Text Area 3 - Staats Tract Backup Material
Draft Exhibit for Easements for Area 3 - Staats Tract Backup Material
Draft Permanent Easement Text Area 11 - Crescent Tract Backup Material
Draft Temporary Construction Easement Text Area 11 - Crescent Tract Backup Material
Draft Exhibit for Easements for Area 11 - Crescent TractBackup Material
Draft Permanent Easement Text Area 14 - Mollison Tract Backup Material
Draft Temporary Construction Easement Text Area 14 - Mollison Tract Backup Material
Draft Exhibit for Easements for Area 14 - Mollison TractBackup Material
Draft Permanent Easement Text Area 16 - Central ParkBackup Material
Draft Temporary Construction Easement Text Area 16 - Central ParkBackup Material
Draft Exhibit for Easements for Area 16 - Central ParkBackup Material
1080 waterline alignment mapBackup Material